ya2 · news · projects · code · about

support for itch.io
[pmachines.git] / prj.org
CommitLineData
ad5ef398 1#+STARTUP: indent
8eb89921 2#+TODO: INBOX BACKLOG READY RED CODE L10N REFACTOR LINT GREEN BUILD CHANGELOG BLOG | DONE
ad5ef398
FC
3#+CATEGORY: pmachines
4#+TAGS: bug(b) calendar(c) waiting(w)
5
c8e3e941 6* RED restore test resolutions
2eabc4e6 7* READY restore test fullscreen
ad5ef398 8* READY fix actions: rewind, prev, next :bug:
2eabc4e6 9* READY restore tests for level 6 and 7
8ce16d6c 10* READY move functional tests in tests from lib.engine
ad5ef398 11* READY refactoring
2eabc4e6
FC
12* BACKLOG improve level domino box basketball: it can be solved trivially
13* BACKLOG bug 3.10-windows: restore windows builds when it's fixed
14* BACKLOG optimize slow tests
15* BACKLOG distutils is deprecated
ad5ef398 16* BACKLOG do intro video with moviepy
2eabc4e6 17* BACKLOG flatpak 21.08
ad5ef398
FC
18* BACKLOG intro animation (from target item to start position)
19* BACKLOG buttons of the scenes enabled sequentially
20- [ ] each scene has a version
21- [ ] when you win save the id + version
22- [ ] put an "update" if id is saved and versions are different
ad5ef398
FC
23* BACKLOG functional tests for performance (frame rate)
24* BACKLOG functional tests for "cleaning" i.e. at the end of the states verify:
25- [ ] active threads
26- [ ] active tasks
27- [ ] current nodepaths (render3d)
28- [ ] current nodepaths (render2d)
29- [ ] current nodepaths (render3d)
30- [ ] current accepting events
31- [ ] current buffers
2eabc4e6
FC
32* BACKLOG teeter-tooter with constraints (real teeter tooter), magnet, road cone, bucket
33* BACKLOG (when panda3d provides it) android build (test with the emulator of android studio)
ad5ef398
FC
34* BACKLOG (when itch.io's client waiting works with wine) functional tests for windows-itch.io
35* calendar :calendar:
36** publish post q1; reschedule
37SCHEDULED: <2024-03-18 Mon +1y>
38** publish post q2; reschedule
39SCHEDULED: <2022-06-18 Sat +1y>
40** publish post q3; reschedule
41SCHEDULED: <2022-09-16 Fri +1y>
42** publish post q4; reschedule
43SCHEDULED: <2022-12-16 Fri +1y>